Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13642238

- Product Categories
- Friendly Links
Information Name: | Generator | Yama power | Sichuan generators |
Published: | 2015-07-20 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Composition sensor diesel generator set of sensors is generally made sensitive element, switching element and the switching circuit of three parts. (1) sensitive element of direct experience of the diesel generator set is measured, and outputs the measured amount of other elements to determine the relationship. Non-power can not be measured directly converted into electricity once, and then converted into electricity. Sensitive element has been referred to the pre-converter. The resilient element of each type of sensor is sensitive components. (2) diesel generator set conversion element will amount sensor output is converted into electrical parameters (voltage, current, frequency, etc.) components. The resistance strain gauges Hall element. (3) diesel generator set conversion circuit converts the electrical parameters generally refers to the amount of electricity (voltage, current, frequency) circuits. Conversion circuit converts the output signal from the role, a common signal amplifier, bridge, oscillators and impedance converter, etc., Shaanxi generators, often with sensitive components, conversion component assembly together. Drying Cummins generator sets new synchronous generator installed before running, generator sets, general should be dry. If the insulation resistance to meet the requirements, can not be dried, Sichuan generators, but load operation begins within 24h preferably not more than 50% of rated capacity. When all running Cummins diesel generator set shut down for maintenance or downtime exceeds a predetermined limit, the insulation resistance is lower than the predetermined value, it must be dried. Such as determining surface moisture, the drying can be used with a load of drying. All because of flooding or wet steam generator pipes leak and must be dried. Drying Cummins generator sets new synchronous generator installed before running, generally it should be dry. If the insulation resistance to meet the requirements, it may not be dried, but the load operation begins 24h preferably not more than 50% of the rated capacity. When all running Cummins diesel generator set shut down for maintenance or downtime exceeds a predetermined limit, the insulation resistance is lower than the predetermined value, it must be dried. Such as determining surface moisture, the drying can be used with a load of drying. All because of flooding or wet steam generator pipes leak and must be dried. Generator | Yama power | Sichuan generators provided by Yamato Power Equipment Manufacturing Co., Ltd. Weifang. Generator | Yama power | Sichuan generator sets Weifang Power Equipment Manufacturing Co., Ltd. Yamato (www.yamacyj.com) (www.fdjz365.com) (www.yama360.com) this year introduced a new upgrade, the above picture is for reference, please call Tel picture on this page or to obtain the latest information, contact: Zoujing Li. |
Admin>>>
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility