Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13642238

- Product Categories
- Friendly Links
Information Name: | Shanghai _ Yamato power generator sets (certified) _ Generator Set |
Published: | 2015-07-18 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Diesel generator set to start operating procedures preheated Preheat units equipped with a preheater, before starting, staff can decide whether to warm up diesel generator operating according to the ambient temperature, the control panel can be controlled with pre button engine start heating work, Chongqing generators, in order to achieve the purpose of preheating. Power control panel key switch from OFF to ON position to play, observed on the instrument panel lights background, a control panel is powered, while the unit is turned on fuel with electronic speed controller or EFI controller unit also in working condition. 2, start the generator set control panel section having an idling / full switch, the user can according to actual needs, choose whether to start or idling at full-time activation. Usually idle running time not more than five minutes, Tianjin generating units, units not long run at idle press the start button, the maximum duration of no more than 30 seconds, the engine driven by the starter motor started, once started successfully, to release the start button, the unit enters the running state. Drying Cummins generator sets new synchronous generator installed before running, generally it should be dry. If the insulation resistance to meet the requirements, it can not be dried, generators, but load operation begins within 24h preferably not more than 50% of rated capacity. When all running Cummins diesel generator set shut down for maintenance or downtime exceeds a predetermined limit, the insulation resistance is lower than the predetermined value, it must be dried. Such as determining the surface is wet, Inner Mongolia generators, can be dried by drying with a load. All because of flooding or wet steam generator pipes leak and must be dried. Winter maintenance Cummins diesel generator set has skill Cummins diesel engine from running at low speed for 3-5 minutes should be to improve the overall temperature of Cummins diesel, lubricating oil inspection work, to put into normal operation after the examination was normal. Cummins diesel engine operation to minimize sudden revving up or stepped on the accelerator maximum, otherwise a long time will affect the life of the valve assembly. Shanghai _ Yamato power generator sets (certified) _ generators provided by Yamato Power Equipment Manufacturing Co., Ltd. Weifang. Yama Weifang Power Equipment Manufacturing Co., Ltd. (www.yamacyj.com) (www.fdjz365.com) (www.yama360.com) is an industry leader in Shandong Weifang, diesel generator sets, over the years, the company is implementing the scientific management, innovation and development , the principle of honesty and trustworthiness, and satisfy customer needs. In Yama generation leadership with the staff warmly welcome all inquiries negotiations to create a better future generation Yama. |
Admin>>>
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility