Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13642238

- Product Categories
- Friendly Links
Information Name: | Yama power generators _ _ Jiangxi generators |
Published: | 2015-07-15 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | After generating sets management. 1. After generating units shut down, pay attention to check whether the generator set "three leakage" phenomenon, oil, fuel, coolant 2. Close the fuel valve 3. Turn the engine room air intake and exhaust facilities 4. Turn off the generator output breaker 5 When you turn off the control panel power key switch, remove the key, keep longer 6. Genset shutdown state or unit maintenance, the generators must start dismantling the battery negative cable should be exhausted fuel and coolant, if necessary. Select common knowledge generating units. 1, the capacity to determine: long-term continuous operation by the unit output power to meet the computational load-wide maximum choice, and backup generators should determine the load capacity of the units in accordance with the importance. Output power diesel ongoing, typically 0.9 times the rated power. 2, number of units determined: General settings usually two or more, in order to ensure continuity of supply and adapt to changes in the electricity load curve. Units Number of units more, we can put turbines will be determined number of units according to electricity load changes, generator sets, diesel engine is often running in the economic load, Jiangxi generators to reduce fuel consumption, reduce the cost of electricity. The best economic operating state of the diesel engine is between 75% -90% of rated power. In order to ensure continuity of supply, common unit itself should consider setting up reserve units. 3, the speed is determined: general civilian should choose the speed from 1000 to 1500 rev / min high-speed unit, while the low-speed units speed of 300 to 350 rev / min suitable for marine host. 4, the voltage to determine: the generator output voltage is determined with the same emergency generators, typically 400V, individual electricity capacity, Zhejiang generators, transmission distance of the project can be used high pressure turbines. After generating sets management. 1. After generating units shut down, pay attention to check whether the generator set "three leakage" phenomenon, oil, fuel, coolant 2. Close the fuel valve 3. Turn the engine room air intake and exhaust facilities 4. Turn off the generator output breaker 5 When you turn off the control panel power key switch, Guangdong generators, remove the key, safekeeping 6. turbines longer shutdown or maintenance unit, you must start the negative battery cable generator sets demolition, but also exhausted fuel when necessary and coolant. Yama power generators _ _ Jiangxi generators provided by Yamato Power Equipment Manufacturing Co., Ltd. Weifang. Yama power generators _ _ Yamato Jiangxi generators Weifang Power Equipment Manufacturing Co., Ltd. (www.wfymfd.com) (www.fdjz365.com) (www.yama360.com) this year introduced a new upgrade, the above picture is for reference, please call Tel picture on this page or to obtain the latest information, contact: Zoujing Li. |
Admin>>>
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility