Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13642238

- Product Categories
- Friendly Links
Information Name: | Generators, Yama power, Inner Mongolia generators |
Published: | 2015-07-11 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Diesel generator output three-phase five-wire distribution system, namely the three-phase line of fire, a centerline, a safe ground wire, that is to say the center line and the earth wire is not connected, the user can according to their own distribution requirements, can choose Three-phase four-wire power generation output, connected to the center line of earth is about to address the centerline sometimes charged artifacts. Users install the unit distribution output, configurable compliance with safety-carrying capacity of the cable caused power outlet and the machine screen or screens, and make sure that the power output of the phase sequence is correct. Molded no open space within the unit or the power unit and the machine sets power outlet and the machine screen or a blank screen unit open cover, replace the power output control and protection of the unit by the main circuit breaker panel. Diesel generator set to start operating procedures preheated Preheat units equipped with a preheater, before starting, staff can decide whether to warm up diesel generator operating according to the ambient temperature, the control panel can be controlled with pre button Start heating the engine work, in order to achieve the purpose of preheating. Power control panel key switch from OFF to ON position to play, observed on the instrument panel background lights, generators, a control panel is powered, while the unit is turned on fuel with electronic speed controller or EFI unit The controller is also in operation. 2, start the generator set control panel section having an idling / full switch, the user can according to actual needs, choose whether to start or idling at full-time activation. Usually idle running time not more than five minutes, Tibet generators, unit not long run at idle press the start button, the maximum duration of no more than 30 seconds, the engine driven by the starter motor started, once started successfully, to release the start button, the unit enters the running state. Diesel generator output power distribution three-phase five-wire system, Inner Mongolia generators, namely the three-phase line of fire, a centerline, a safe ground wire, that is to say the centerline and the earth wire is not connected, the user can according to their own distribution requirements , can choose the three-phase four-wire power output on their own, will soon be connected to the center line of earth, in order to resolve the centerline sometimes charged artifacts. Users install the unit distribution output, configurable compliance with safety-carrying capacity of the cable caused power outlet and the machine screen or screens, and make sure that the power output of the phase sequence is correct. Molded no open space within the unit or the power unit and the machine sets power outlet and the machine screen or a blank screen unit open cover, replace the power output control and protection of the unit by the main circuit breaker panel. Generators, Yama power, Inner Mongolia generators provided by Yamato Weifang Power Equipment Manufacturing Co., Generators, power Yama, Yama Inner Mongolia generators Weifang Power Equipment Manufacturing Co., Ltd. (www.wfymfd.com) (www.fdjz365.com) (www.yama360.com) this year introduced a new upgrade, the above picture is for reference, please call Tel picture on this page or to obtain the latest information, contact: Zoujing Li. |
Admin>>>
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 29262 visitor
Copyright © GuangDong ICP No. 10089450, Yama Weifang Power Equipment Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility